Sunday, November 2, 2014

A5 Class System Evaluations–Monday 11/3/2014

To wrap up our look at the variety of HVAC systems each group will look at all the assigned systems using your submissions from the class database.

We’ll allow about 20 minutes for you to perform the review and then look at the results.

  • If you finish early you can start looking at A6.

Each team’s task is to look at the “major systems” assigned – one of the three systems for most team’s websites.  Those systems with the team number are.

1    CAV
2    VAV
3    Window AC
4    Rooftop Package Unit
5    Radiant Floor Heating
6    Convective Heating
7    High Temperature Radiant Heating
8    Chilled Beam
9    Combination Home Air Heating and Cooling
10    Passive Solar - Trombe Wall
11    Geothermal Heat Pump
12    Residential Hot Water Radiators
13    Active Solar HVAC

You are to rate each team on two scales using this form:

  1. Engineering Understanding – of the engineering aspects of the system
  2. Site Organization – for viewer understanding

No comments:

Post a Comment